@article{GENERAL, author = {Creswell, Paul and McFarlane, Ian}, url = {http://library.imarest.org/record/7650}, journal = {Conference Proceedings of INEC}, title = {Bang Rachan Class Minehunter mission system upgrades: lessons learnt}, abstract = {The Royal Thai Navy Bang Rachan Class Minehunters have been upgraded within a 3 year programme to provide a 15 year life extension with works performed in Royal Thai Navy Dockyard in Phra Chulachomklao, Bangkok. The life extension of the platforms includes: replacement Mission System, upgraded Machinery control and automation for the main engine together with generator overhauls and a new electrical distribution system. Extensive hull and deck repairs on the 1980&rsquo;s L&uuml;rssen built wooden hull minehunters was an essential activity to ensure success to the life extension. The mission system replacement provides new suit of; sonar, command &amp; control system, autopilot, radar and communications (internal and external). In addition to the platform works, a new signature range was supplied to allow acoustic and magnetic ranging pre and post upgrade, to ensure signature compliance. Lessons learnt on the programme broadly fall into 2 categories, those pre-contract in the bidding and negotiation phase and those during the execution of the contract. A taut bid timeline denied the ability to fully identify the required specifications and boundaries of the task associated with the platform. This early lack of clarity cascaded through the project.<br> The key lessons learnt during the programme execution were:<br> - Ensuring clear communications across language barriers between all parties<br> - Defining exact supplier specifications and supply chain timescales and ensuring the supplier understood andaccepted these<br> - Accessing appropriate levels of skilled personnel for the technically demanding aspects of the programme<br> - Managing and planning for emergent work caused by the aging nature of the platforms, particularly theirwooden construction.<br> Some of the methods used to counter and solve issues encountered were:<br> - Open communication particularly when problems arise, early flagging of issues usually means they can befixed before they develop<br> - Ensuring well understood and accepted scope of works providing known boundaries and interfaces (both withcompanies and equipment)<br> - Ongoing use of &lsquo;plan on a page&rsquo; to provide communication up and down the supply chain, and internally,allowing everyone to understand the current status, short term plans, and their delivered value to theprogramme<br> - Close scrutiny of suppliers:&ndash; key to understanding bought in equipment / services, maturity, and wherenecessary embedding Thales staff where challenges were being encountered<br> - Rigorous integration and test strategy for acceptance prior to delivery, and then adoption of an incrementalacceptance strategy with the customer before final handover<br> - Introduction of suitably qualified and experience personnel and appropriate in country training<br> - Adopting an approach of &ldquo;spend to save&rdquo; early in the programme &ndash; something that proved to be far cheaperand quicker to realise costs early solving issues before they became major problems later in the project<br> - Continual consideration of signatures (acoustic, magnetic, electromagnetic) and the impact of any tasks ordecisions on these.}, number = {GENERAL}, recid = {7650}, address = {2020-10-05}, }