000007532 001__ 7532 000007532 005__ 20241024114655.0 000007532 02470 $$2doi$$a10.24868/bwtc6.2017.001 000007532 035__ $$a1453328 000007532 037__ $$aGENERAL 000007532 245__ $$aEssential Preparations for compliance and contingency options 000007532 269__ $$a2017-01-13 000007532 336__ $$aConference Proceedings 000007532 520__ $$aEven though the Ballast Water Management Convention (BWMC) (referred to herewith as the Convention) has been ratified and a few ballast water management systems (BMWS) have received US Coast Guard (USCG) type approval, many shipowners and operators are reticent to begin the significant process of planning for compliance with ballast water discharge and performance standards. This delay is most probably due to the uncertainty in the implementation dates in the BWMC and limited options of USCG type approved BWMS.&nbsp; These delays may result in significant ramifications for shipowners if the process for compliance is not fully evaluated.&nbsp; This process includes selecting, designing installation, purchasing, start-up and commissioning of BWMS.&nbsp; Clarity on the implementation schedule should be determined at the 71<sup>st</sup> session of the Marine Environmental Protection Committee of the International Maritime Organization (IMO MEPC 71) and allow shipowners to plan for compliance. An important aspect of implementation is developing a strong compliance plan. A central part of compliance is identifying possible problems and contingency options that may alleviate any potential port State control issues.&nbsp; The paper will identify possible problems and contingency measures to ensure ship operations are not impacted.&nbsp; An important issue is that the BWMC does not include provisions for contingency measures.&nbsp; The paper will also outline needed contingency measures to be addressed by the IMO in any amendments to the BWMC. 000007532 542__ $$fCC-BY-NC-ND-4.0 000007532 6531_ $$aBWM Convention 000007532 6531_ $$acompliance 000007532 6531_ $$acontingencies 000007532 7001_ $$aDiCanna, Debra$$uChoice Ballast Solutions 000007532 773__ $$jBWTC 2017 000007532 773__ $$tConference Proceedings of BWTC 000007532 789__ $$whttps://zenodo.org/record/1453328$$2URL$$eIsIdenticalTo 000007532 8564_ $$97f5d3b28-22eb-47f6-99e9-905e2a89bd49$$s434669$$uhttps://library.imarest.org/record/7532/files/10_24868BWTC6_2017_001.pdf